MY INTERNSHIP 2ND WEEK BLOG

21 JAN - 25 JAN 2019

WEEK 2 

Before I start talking about my week 2, Im going to do a little briefing about my blog from week 1 to week 22. In my weekly blog, is abit disappointed that I cant learn more on software work during this 6 month of intern because I was asked to follow one of my senior Kevin Woon to run more on site due to lack of staff take care some of the site. But Kevin told me not to feel disappointed because running site have its own benefit also such as learning detailing about building a build-in furniture so in future you get to have knowledge on drawing detailing in autocad. Then you also get to know how things are build such as pillar, wall, flooring, drainage and so on. On the first day of week 2, Kevin do some briefing to me about the site which is located at Section 16, Petaling Jaya. This site actually is already completed build half year ago but there is a lot of problem which have not settle yet due to lack of staff. Since I already joined this company so my boss Mr Steven decide to ask to follow up this site. 


  Above the image is some feedback and updated from the client that we need to focus on this week.

METAL SUPPLER INSTALLATION PART




Above this two image is about we need to arrange with the metal supplier to install the roulette door to complete the outlook of the basin at the swimming pool area.


PLUMBER SUPPLIER INSTALLATION PART

                   
Above this two image, we are asked to change the length of the shower head same as the second picture.

Then above this two image, thing we need to change which the the hanging rack need to be move more to the right side to prevent knocking due to the hanging rack is near to the toilet bowl and I also asked to buy 3 more towel hook because not enough to install other bathroom.

CARPENTER PART

             

   

For the carpentry work there are a lot of minor problem need to be touch up such as the stain on the door and some area need add on such as door and lower cabinet. 

On week 2, what I need to do which is arranged with supplier to solve the problem which stated above.

On Thursday 24th of Jan, our company organize a Chinese New Year Eve company dinner before we prepare to start our Chinese New Year celebration.



A group picture of Hoe & Yin Design studio member. Unfortunately, some of the staff  resign from the company.


Mr Steven and Mrs Katherine also organised a lucky draw prizes during the Chinese New Year Eve dinner.